Targets, progress and status

Linear gauge

Places a value on a linear scale with optional target and performance bands.

  • Indicator
  • Performance against target
  • Progress

What it answers

How does a metric sit within a straight performance scale?

Shape
Straight scale and value marker
What it shows
Target gap and performance band.

Example

The question

Is stock cover inside the safe range?

Days of stock cover, main warehouse

Days of stock cover, main warehouseA straight scale from 0 to 40 days with bands: too low under 14, safe 14 to 30, too high over 30. The marker shows 23 days, inside the safe range.Too lowSafeToo high01020304023 daysDays of cover
Days of stock cover, main warehouseA straight scale from 0 to 40 days with bands: too low under 14, safe 14 to 30, too high over 30. The marker shows 23 days, inside the safe range.Too lowSafeToo high01020304023 daysDays of cover
A straight scale from 0 to 40 days with bands: too low under 14, safe 14 to 30, too high over 30. The marker shows 23 days, inside the safe range.

Illustrative data. It belongs to no company.

When to use it

Use it when

Compact bounded performance reporting.

Avoid it when

When range bounds are arbitrary or a trend is the real question.

How to read it

Read position on the linear scale and compare with target/ranges.

The data you need

Layout
Single-record summary
Fields
Metric: text; Value,Minimum,Maximum: numbers
One row is
One metric and its scale limits. What is the grain?
Rules
Require Maximum > Minimum and define out-of-range handling.
Optional
Target and ordered performance-band boundaries.
Preparation
Confirm the metric definition, reporting period, target and favourable direction. Calculate rates or progress before applying transparent status rules.
Units
State each metric's unit. Achievement or completion needs its goal/baseline denominator; status colours and ordinal ratings are not numeric units.
Example of the input layout: Single-record summaryA single-record summary: one row holding the current value and its context.MeasureRevenueValue6.6mPeriodSep 2026Target6.2m
A single-record summary: one row holding the current value and its context.

Worked example

Value 72, min 0, max 100, target 80. Mark 72 and 80 on the same track; the value is 8 below target.

MetricValueMinimumMaximum
Capacity720100